67
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020421 REV A - Jan 2019
To reconfigure the AC load center for 110-120 VAC service
Open the splice compartment door.
At the cabinet AC load center, switch all breakers to the
OFF
position.
Remove the left cover panel from the AC load center.
Using a slot head screwdriver, loosen the two terminal screws at the bottom of the Main Service Disconnect
breaker.
Install a 12 AWG wire jumper (3.5 inch length) between the two terminal screws (L1, L2) of the Main Service
Disconnect breaker.
For cabinets equipped with a generator connector, perform these additional steps:
a.
Remove the right cover panel from the AC load center.
b.
Disconnect the L2 wire from the Gen Conn breaker. Remove the other end of the L2 wire (red) from the back
of the generator connector plug.
c.
Install a 12 AWG wire jumper (3.5 inch length) between the L1 and L2 terminal screws on the Gen Conn
breaker.
d.
Disconnect the white leads from the Rectifier A and Rectifier B breakers, then connect the white leads to the
neutral bar.
e.
Replace the right cover panel on the AC load center.
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6: