Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
20
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
Installation Manual
_________________________________________________________
User-Supplied Items
Supply the following items for cabinet installation.
Tools
Bring the following tools to the installation site:
• Power drill with universal socket and screwdriver bit sets
• Socket wrench/nut driver set (standard)
• Screwdriver set (standard)
• Box wrench set (standard)
• Beam Level
• Insulated needle-nose pliers
• Wire stripper
• Compression crimping tool
• Fiber cleaver
• Fiber splicer
• Modular MS2 or 710 splicing tool
Materials
Bring the following materials to the installation site:
• Two-hole compression lug (3/4” hole spacing) for #2 AWG earth ground wire
• Strain relief for #2 AWG earth ground wire
• Strain relief for #6-8 AWG AC supply wiring
• MS2 or 710 connectors for copper line splicing
• Silicone sealant
Equipment
Bring the following equipment to the installation site:
• Boom crane or derrick capable of lifting a 3000 lb load
• Four (4) wire rope slings, minimum 6 foot length each
• Five (5) connecting links or lifting hooks
• Four (4) shims
• Digital multi-meter
• Optical power meter
• Digital multi-function test set