Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
108
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
Installation Manual
_________________________________________________________
Installing Fiber Patch Cords
Factory-installed FAC-3200E GPON/AE fiber distribution bulkheads include a fiber relay ramp among the routing/dressing
elements. The relay ramp is installed between the front and rear racks, enabling you to pass fiber jumpers terminated to
bulkhead positions on the rear rack through the compartment to the OLT equipment located on the front rack.
Neatly dress any slack fiber within the comb ducts above the OLT equipment on the front rack.