21
FieldSmart
®
Fiber Active Cabinet (FAC) 3200
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 020421 REV A - Jan 2019
Cabling Requirements
Cables supplied to the cabinet must meet the following minimum requirements.
Note:
Local climatic conditions, site conditions, or local practices may require adjustments to cabling requirements.
Function
Facility
Requirements
Power
Ground
Copper
2 AWG solid bare copper wire (to earth ground circuit); terminates to ground bar with
2-hole compression lug
AC
Copper
6 to 8 AWG; Follow National Electric Code (NEC) and local codes