Replacing a Power Filter Unit
▀ Installing the Replacement PFU
▄ ASR 5000 Installation Guide
226
Step 8
Fasten the lug attached to the power feed cable to the PFU:
Step a
Insert the lug over the two terminals labeled -VDC. These are the two bottom terminals on the
PFU.
Step b
Secure the lug to the -VDC terminals with the remaining two washers and nuts you removed in
step 7. The nuts on the PFU should be torqued to 50 in-lb. (5.65 N-m).
W
ARNING
:
To avoid the risk of fire, take proper precautions to ensure that the power feed and return lugs are not
touching.
Um einen Kurzschluss zu vermeiden, duerfen sich die beiden Stromkabel nicht beruehren.
Step 9
Reinstall the plastic terminal cover.
Caution:
To avoid the risk of electric shock and/or potential damage to the system, never operate the chassis
without the plastic terminal cover.
In addition, the power and return lugs must not protrude past the edge of the plastic
terminal covers. Any portion of the lug that is exposed must be covered with shrink wrap.
Step 10
Apply power to the PFUs using the information and instructions in the
Applying Power to the Chassis
section of the
Applying Power and Verifying the Installation
chapter of this guide.
Summary of Contents for ASR 5000 Series
Page 9: ...Contents ASR 5000 Installation Guide ix Spare Component Recommendations 317 ...
Page 10: ......
Page 14: ......
Page 54: ......
Page 64: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 126: ......
Page 186: ......
Page 194: ......
Page 206: ......
Page 228: ......
Page 276: ......
Page 284: ......
Page 290: ......
Page 300: ...RoHS Compliance Statement Chassis ASR 5000 Installation Guide 300 Chassis ...
Page 301: ...RoHS Compliance Statement Fan Assembly ASR 5000 Installation Guide 301 Fan Assembly ...
Page 303: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 303 Full Product ...
Page 304: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 304 ...