Power Cable Requirements
You can install up to three chassis in an equipment rack or telecommunications cabinet. Typically power cabling is run
from the office Power Distribution Frame (PDF) to a Power Distribution Panel (PDP) installed in the rack or cabinet and
then to each of the chassis. Due to the required bending radius at each of the system’s PFUs, distributing power through
a PDP allows you to use a smaller, more flexible cable for each chassis.
The following table identifies the recommended gauges for power cables.
Table 47.
Recommended Cable Gauge Information
Termination
Conductor Sizing Information
PDF to Fuse Panel
Assuming an 80-foot (24 meter) loop length, each cable between the PDF and PDP must be
the equivalent of 350,000 circular mils or greater.
Calculations assume a 0.3 volt drop from the PDF to the PDP, and a 0.3 volt drop from the
PDP to the chassis. This is a total voltage drop of 0.6 volts.
Fuse Panel to ASR 5000
Assuming an 18-foot (5.5 meter) loop length, each cable between the PDP and the chassis
must be the equivalent of 83,690 circular mils (1 AWG) or greater. Use high-flex cable.
Calculations assume a 0.3 volt drop from the PDF to the PDP, and 0.3 volt drop from the fuse
panel to the chassis. This is a total voltage drop of 0.6 volts.
The following figure and table provide details for wiring the PFUs.
Summary of Contents for ASR 5000 Series
Page 9: ...Contents ASR 5000 Installation Guide ix Spare Component Recommendations 317 ...
Page 10: ......
Page 14: ......
Page 54: ......
Page 64: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 126: ......
Page 186: ......
Page 194: ......
Page 206: ......
Page 228: ......
Page 276: ......
Page 284: ......
Page 290: ......
Page 300: ...RoHS Compliance Statement Chassis ASR 5000 Installation Guide 300 Chassis ...
Page 301: ...RoHS Compliance Statement Fan Assembly ASR 5000 Installation Guide 301 Fan Assembly ...
Page 303: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 303 Full Product ...
Page 304: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 304 ...