Replacing a Power Filter Unit
Installing the Replacement PFU ▀
ASR 5000 Installation Guide ▄
225
Step 3
Use a Phillips #2 screwdriver to tighten each of the four screws on the PFU to secure it to the chassis.
Step 4
Use a Phillips #2 screwdriver to remove the plastic cover from the power terminals.
Each of the four power terminals is shipped with one nut and two washers. The 165A PFU has one lock-washer and one
flat washer.
W
ARNING
:
To avoid electric shock, ensure that the power source is off before attaching power cables to the
PFU(s) installed in the chassis.
Spannungsversorgung abschalten vor Anschluss der Kabel an die Netzteile, um einen
elektrischen Schlag zu vermeiden.
Step 5
Use a Phillips #2 screw driver to remove the plastic cover from the power terminals.
Step 6
Use a 9/16-inch nut driver or socket wrench to remove the nut and the lock-washer on the PFU from each of the four
terminals.
Step 7
Fasten the lug attached to the power return cable to the PFU:
Step a
Insert the lug over the two terminals labeled RTN. These are the two top terminals on the PFU.
Step b
Secure the lug to the RTN terminals using two of the four washers and two of the four nuts that
were removed in step 3. The nuts on the PFU should be torqued to 50 in-lb. (5.65 N-m).
Summary of Contents for ASR 5000 Series
Page 9: ...Contents ASR 5000 Installation Guide ix Spare Component Recommendations 317 ...
Page 10: ......
Page 14: ......
Page 54: ......
Page 64: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 126: ......
Page 186: ......
Page 194: ......
Page 206: ......
Page 228: ......
Page 276: ......
Page 284: ......
Page 290: ......
Page 300: ...RoHS Compliance Statement Chassis ASR 5000 Installation Guide 300 Chassis ...
Page 301: ...RoHS Compliance Statement Fan Assembly ASR 5000 Installation Guide 301 Fan Assembly ...
Page 303: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 303 Full Product ...
Page 304: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 304 ...