Applying Power and Verifying the Installation
▀ Applying Power to the Chassis
▄ ASR 5000 Installation Guide
156
After the system successfully boots and the initial configuration is applied, the system is ready to be configured or offer
services.
Applying Power to the Chassis
Once you have properly connected all power and ground cables to the chassis according to the instructions in “Cabling
the Power Filter Units”, follow the instructions below to apply power to the system.
Step 1
Connect a terminal to the Console port of the primary SPIO.
Step 2
Ensure that the circuit breakers on the system’s Power Filter Units (PFUs) are in the OFF position.
Step 3
Turn the power source on.
Step 4
Check the voltage level and polarity at the terminals for each PFU. Place the positive probe of a voltage meter on the -
VDC terminal and the common probe of the meter on the RTN terminal. The meter should display a voltage
approximately equal to that of power source.
Step 5
Power on the system PFUs.
Step a
Optional. If the circuit breaker on your PFU is equipped with a locking clip, move the clip to the
left unlocking the circuit breaker’s actuator.
Step b
Flip the circuit breaker on the PFU to the ON position.
Summary of Contents for ASR 5000 Series
Page 9: ...Contents ASR 5000 Installation Guide ix Spare Component Recommendations 317 ...
Page 10: ......
Page 14: ......
Page 54: ......
Page 64: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 126: ......
Page 186: ......
Page 194: ......
Page 206: ......
Page 228: ......
Page 276: ......
Page 284: ......
Page 290: ......
Page 300: ...RoHS Compliance Statement Chassis ASR 5000 Installation Guide 300 Chassis ...
Page 301: ...RoHS Compliance Statement Fan Assembly ASR 5000 Installation Guide 301 Fan Assembly ...
Page 303: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 303 Full Product ...
Page 304: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 304 ...