Installation Procedure Overview
Required Tools and Equipment ▀
ASR 5000 Installation Guide ▄
59
Required Tools and Equipment
This section lists the tools and equipment needed for installation.
Hand Tools
The following hand tools are required for installation of the chassis, application and line cards, fan tray assemblies, and
power filter units:
Phillips #1 and #2 hand screwdrivers. Used to tighten thumb-screws on cards, fan tray assemblies, PFUs, and
mounting brackets.
Caution:
The inappropriate use of electric or pneumatic torque drivers, or power drill/impact drivers to
loosen or tighten fasteners may result in damage to system components.
9/16-inch nut driver or ratchet and socket set. Used to connect power and return cables.
3/8-inch nut driver or ratchet and socket set. Used to connect grounding cables.
Torque wrench (rated 50 in-lb [5.65 N-m]) with 9/16-inch socket for tightening lugs to power terminals.
Grounding wrist and/or heel straps. Used to prevent Electro-Static Discharge (ESD) as discussed in the
Protecting Against Electro-static Discharge
section that follows.
Caution:
During installation, maintenance, and/or removal, wear grounding wrist and/or heel straps to avoid
ESD damage to the components. Failure to do so could result in damage to sensitive electronic components and
potentially void your warranty.
Equipment
The following equipment is necessary to install the chassis and verify that it is ready for configuration:
Standard 19-inch (48.26 cm) equipment rack or telecommunications cabinet with mounting hardware. Additional
hardware, such as extension brackets (not supplied), may be used to install the chassis in a standard 23-inch
(58.42 cm) cabinet or rack.
Voltmeter to measure input voltages at the PFU terminals.
Heat gun for installing shrink wrap tubing over power cable lugs.
Console cable supplied with the Switch Processor I/O (SPIO) line card.
A computer or terminal server with a 9-pin RS-232C serial port, or 25-to-9-pin male RS-232C adapter. It will be
connected to the SPIO's Console port for accessing the command line interface (CLI) for initial system
configuration.
Pallet jack and/or chassis lift to move and position the ASR 5000 chassis. Without such mechanical assistance,
moving and positioning the chassis will require multiple craftpersons trained to safely handle heavy rack-
mounted units.
Summary of Contents for ASR 5000 Series
Page 9: ...Contents ASR 5000 Installation Guide ix Spare Component Recommendations 317 ...
Page 10: ......
Page 14: ......
Page 54: ......
Page 64: ......
Page 90: ......
Page 104: ......
Page 122: ......
Page 126: ......
Page 186: ......
Page 194: ......
Page 206: ......
Page 228: ......
Page 276: ......
Page 284: ......
Page 290: ......
Page 300: ...RoHS Compliance Statement Chassis ASR 5000 Installation Guide 300 Chassis ...
Page 301: ...RoHS Compliance Statement Fan Assembly ASR 5000 Installation Guide 301 Fan Assembly ...
Page 303: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 303 Full Product ...
Page 304: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 304 ...