doseBadge⁵ noise dosimeter - instrument handbook
33
The measurement will start and the available options will change from Start, to Pause and
Stop.
In the example on the previous page, the top instrument is ready to start and the bottom
instrument is already running. The Pause and Stop options are available.
11.1.5 Measurement running indication
When a doseBadge is running, the blue LED will flash every two seconds. See page 77 for
details of the LED status indicators.
11.2
Pausing a measurement
When your doseBadge is running and measuring data, the blue LED will flash every
two seconds. The measurement can be paused using a number of different methods as
described below.
11.2.1 Pausing a measurement with the wand
Connect to your doseBadge and select the measure option as shown below:
When the instrument is measuring, the options are to either pause it or stop it. The small
green “Recording” icon in the status bar indicates that the instrument is measuring.
Pressing the Up button will pause the measurement and a confirmation will appear for a
few seconds:
11.2.2 Pausing a measurement with dBLink
To pause a measurement with dBLink, connect to the required instrument. From the
instrument discovery window, press the blue pause button. Press again to confirm.