
7 8 4 4
M A N U A L T R A N S M IS S IO N
F ig . 7 B -1 5 L - - D is a s s e m b ly o f M a i n s h a f t
J-22873
2ND GEAR
BUSHING
J-22873
1ST GEAR
BUSHING I
F ig . 7 B - 1 7 L ~ l n s t a l l i n g 3 r d S p e e d G e a r B u s h in g
16. Move all transmission gears to neutral except the
reverse idler gear which should be engaged approximately
3/8 of an inch (leading edge of reverse idler gear teeth lines
up with the front edge of the 1st speed gear). Install cover
assembly with new gasket to transmission case. Shifting
forks must slide into their proper positions on clutch sleeves
and reverse idler gear. Forks must be positioned as in
removal.
17. Install cover attaching olts and torque to 20-25 ft.
lbs.
F ig . 7 B - 1 6 L ~ l n s t a l l i n g 2 n d S p e e d G e a r B u s h in g
b
18. Using Tool J-8109, replace gearshift lever and
check operation of transmission.
O V E RH A U L M A N U A L
Summary of Contents for 1977 Monte Carlo
Page 1: ...CHEVROLET ST 333 80...
Page 4: ......
Page 6: ......
Page 50: ......
Page 70: ......
Page 100: ...4B 32 REAR AXLE DIFFERENTIAL Fig 24F lnstalling Pinion Flange OVERHAUL M AN U AL...
Page 126: ......
Page 136: ......
Page 142: ...5 6 BRAKES Fig 5 1 1A Gaging Piston Rod OVERHAUL M AN U AL...
Page 168: ......
Page 248: ......
Page 402: ...7C 6 CLUTCHES Fig 7 C 1 2 E D e p r e s s in g L ever Fig 7 C 1 4 E S ta k in g N u t...
Page 404: ......
Page 414: ......
Page 420: ......
Page 421: ......
Page 422: ......
Page 423: ......
Page 424: ......
Page 427: ......
Page 428: ......