30
I =
Valve motorization (
4-5-6
)
II = NTC10K probe on
ACS tank (
2
)
III = NTC10K probe on
Technical
w
ater Puffer (
3
)
Scheme 05 :
the boiler/thermostove is connected to a technical water puf
fer and to an ACS tank.
The boiler/thermostove is switched of
f when all the pr
obes ar
e satisfied. The boiler/thermostove is switched on when one of the pr
obes is on call.
The heating water will then be taken fr
om this puf
fer by means of the pumps and the r
elays ar
e not contr
olled by the boiler/thermostove contr
ol unit.
a)
To set the temperatur
e in the DHW tank, pr
ess the
key
. Use the
and
keys to select the desir
ed degr
ees
b)
T
o set the temperatur
e in the technical water puf
fer
, pr
ess the
key and use the
and
keys to select the desir
ed degr
ees
c)
T
o set the work power pr
ess the
key and adjust it with the keys
and
Sanitary water will always have priority on the heating.
The scheme is indicative and wants to demonstrate only the components that can be managed by the boiler/thermostove. Any r
elay pumps must be
contr
olled separately fr
om the boiler/thermostove.
3 vi
e
3 wa
y
comune - N
common -
N
Lato sanitatio
DHW side
Lato riscaldam.
heating side
Sond
a
sup.
puffe
r
Puffer
uppe
r
prob
e
Termostat
o
estern
o
External
thermostat
Sonda accumulo
sanitario o sonda inf. puffe
r
DHW probe or puffer
lower prob
e
1
2
3
4
5
Terminal block:
numerical correspondence
for the v
arious electrical connections
.
6
I
II
III
EN
Summary of Contents for IDRO 20
Page 56: ...56 IT NOTE Cod 001117...
Page 112: ...56 EN NOTES Cod 001117...
Page 168: ...56 FR NOTES Cod 001117...
Page 224: ...56 ES NOTAS Cod 001117...
Page 280: ...56 PT Cod 001117 NOTAS...
Page 336: ...56 DE Cod 001117 HINWEISE...
Page 392: ...56 DE NL 56 Cod 001117 OPMERKINGEN...
Page 393: ...GR GR1 CANADIAN IDRO 20 Cod 001117...
Page 395: ...GR 3 6 mm A1 UNI EN ISO 17225 2 3 42 kg...
Page 403: ...GR 11 UNI 10412 2 2009 C 60 C A1 3 4 M A2 3 4 M B1 1 2 B2 1 2 M A1 A2 B2 B1...
Page 404: ...GR 12 30 UNI CTI 8065 4...
Page 405: ...GR 13 1 bar 1 5 bar 1 14 1 bar 0 3 bar...
Page 406: ...GR 14 3 1 2 6 5 3 volt 4 3 3 4...
Page 407: ...GR 15 15 15 C 0 12 12 20 20 30 30 6 mm 30 mm 8 A1 UNI EN ISO 17225 2...
Page 429: ...GR 37 1 BLACK OUT 2 3 4 5 I 6 I 7 90 C 8 I TRIAC COC C D E 1300...
Page 430: ...GR 38 On Off On Off 1 BLACK OUT 1 10...
Page 431: ...GR 39 100 C ALAR DEP FAIL ALAR DEP FAIL 100 C ALAR SIC FAIL ALAR SIC FAIL 4A 2 5 bar 5 C 10...
Page 432: ...GR 40 2 3 15 30 60 90...
Page 433: ...GR 41 5 6 380 C 400 C 450 C 2 3 INOX 5...
Page 434: ...GR 42 60 90 20 24 28 32...
Page 435: ...GR 43 2 3 15 30 60 90 5 6...
Page 436: ...GR 44 2 3 INOX 5 380 400 450...
Page 437: ...GR 45 7 60 90 20 24 28 32...
Page 438: ...GR 46 2 3 3 15 AT T 16 16...
Page 439: ...GR 47 T...
Page 440: ...GR 48 OFF 1300 SERV SERV...
Page 441: ...GR 49 1 2 1 2 1 2 1 2 3 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 6 1 2 I 3 4 5 6...
Page 443: ...GR 51 1 2 1 2 1 2 3 1 2 3 1 1 1 1 1 2 3 1 2 3 1 2 1 65 C 40 C 80 C 50 55 C 50 55 C 2 1 2 1 2...
Page 444: ...GR 52 1 1 1 2 1 2 1 2 1 230 C 2 1 1 4 6 1 2 3 4 5 1 2 3 4 5...
Page 445: ...53 24 1 2 3 GR...
Page 446: ...GR 54 001117...