![Briggs & Stratton 115400 Manual Download Page 145](http://html.mh-extra.com/html/briggs-and-stratton/115400/115400_manual_2810659145.webp)
144
6
4. Install governor gear. Ensure that
counterweights ([
A
] Fig. 30) move freely
without binding.
Fig. 30
5. Install cylinder cover or sump.
See
SECTION 10- CYLINDERS, COVERS
AND SUMPS.
NOTE: (161432 Type 0080-01)
When
assembling governor lever assembly (
A
), ensure
that tab on strike plat e ([
B
] Fig. 31) is between
upper and lower half of lever clamping area.
Fig. 31
6. Re install any components you removed
to gain access to the cylinder cover.
7. Perform a static adjustment.
See
SECTION 1- SAFETY, MAINTENANCE
AND ADJUSTMENTS.
Summary of Contents for 115400
Page 5: ...4 1 ...
Page 10: ...9 1 BRIGGS STRATTON NUMERICAL IDENTIFICATION SYSTEM ...
Page 15: ...14 1 Fig 7 Fig 8 Fig 9 Fig 10 ...
Page 29: ...28 1 ...
Page 77: ...76 4 ...
Page 87: ...86 4 ...
Page 89: ...88 5 ...
Page 135: ...134 6 ...
Page 161: ...160 7 ...
Page 163: ...162 8 ...
Page 179: ...178 9 ...
Page 189: ...188 10 ...
Page 202: ...201 10 Fig 34 Fig 35 Fig 36 Fig 37 Fig 38 Fig 39 ...
Page 207: ...206 10 ...
Page 209: ...208 11 ...
Page 219: ...218 11 ...
Page 221: ...220 12 ...
Page 229: ...228 12 ...
Page 231: ...230 13 ...
Page 281: ...280 14 ...