4.2 Evaluation Unit LB 442
34
4.2 Evaluation Unit LB 442
Make the connections on the rear panel of the evaluation unit as
shown in the wiring diagram in the appendix to this manual on
page 146.
LB 442
Detector
Mains supply
Fuse
c
a
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
Relay 1
Relay 2
Relay 3
Dig. In 2
Dig. In 3
Current In (+/-)
Current Out (-/+)
1(+)
2(-)
Voltage
selector
Dig. In 1
Figure 23: Terminal connection evaluation unit (rear panel)
Carefully note the power supply for the instrument and ob-
serve all safety previsions regarding the power supply.
A separate fuse protection and an easy to access shutoff
have to be foreseen, since the evaluation unit does not in-
clude its own mains switch.
Refer to the wiring diagram in the appendix to this manual for the
connections. The terminals are described as follows:
Detector Terminal (2a/2c)
Connection is made via 2-wire technique; the detector protection
type is EEx de IIC T6 or EEx de (ib) IIC T6 or EEx de (ib) IIB T6.
For inherently safe installation, the cable ends on the strip terminal
must be protected by a 10 mm long shrink-down plastic tubing
(see also the connection diagram).
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...