12.2 Safety Instructions
108
12.2.2 Rod Source Replacement
Radioactive sources may be replaced only by competent and li-
censed personnel, in compliance with the official regulations, since
these persons have to work with an unshielded source for a short
time.
Therefore,
they have to carry a pocket dosimeter indicating
the level of radiation, so that the actual radiation exposure
during work can be documented
. Moreover, this work has to be
coordinated with the Radiation Safety Officer.
Prerequisite for this work is that the personnel is familiar
with the exact shielding construction; therefore, the respec-
tive drawings must be available.
Preparation
All necessary work has to be prepared such that it can be carried
out quickly, so that exposure to the unshielded source is kept to a
minimum. Using a drawing of the shielding, you should plan the
best procedure and have the following tools handy:
a) 2 pairs of pliers
b)
large
screwdriver
c) 1 screw M4
-
Turn the shielding to position "CLOSED” and secure it.
-
Have the transport shielding for the old source ready.
-
Bring the new source in its transport shielding close to the
measuring location and open it such that the new rod source
can be taken out and the old one can be inserted as quickly as
possible.
Do not touch the source with your fingers to prevent a high partial
body dose. Make sure the source is not mixed up with the new or
any other source.
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...