13.6 Menu Structure
148
13.6.2 Calibrat
ions and Measurement
Menu
Product selectionl
No. 1 - 10
Product :
1
1. Rate:= cps
1. Speed.:= m/s
1.Me. time:= s
Belt Length :
Value : m
Rate : = cps
Belt Length : m
Rate : = cps
Tare Time : s
Tare Time :
Value : s
1. Compared weight
1. : t
(MW = t
sk1: Calibrate
sk2: Live Display
sk1
sk2
more
sk1
sk2
more
sk2: Calculate
sk1: Data input
----------------------------
.
.
----------------------------
Coeff. a1
Value : =
Coeff. a3
Value : =
Square error qf
Value : =
1.0000
Factor
Value : =
0.0000
Offset
Value : =
Coeff. a2
Value : =
Calibrate Mode
lin / qua / kub / auto
sk1: Tare Measurem.
sk2: Calibrate
sk1
sk2
more
Tare measure at :
- Belt length
- Time
sk1: Service menu
sk2: Interfaces
sk1
sk2
etc.
Interfaces
RS 232:
PC
RS 485:
Slave
PC Access Control
Read Only Data /
Change of Data
Number of Detectorsl
Value: n
Slave n
Address: n
Background for
Rod Detector
Rate = :
/s
Totalizer
0.000 t
+ - more
Detector 1
HV-auto = 700V
Count Rate =8522/s
more
Detector 2
HV-auto = 700V
Count Rate= 8522/s
more
Detector 1
Det. Temp = 27°C
more
Detector 2
Det. Temp = 27°C
done
Detector Temp.
°C
Tare Counts
cps
Live Counts
cps
Live Current Outp.
mA
Actual Speed.
m/s
Actual Moisture
%
Totalizer Dry Mass
t
Loading Dry
t/h
Loading.
t/h
10. Rate:= cps
10. Speed.:= m/s
10. Me. time:= s
10. Compared weight
10. t
(MW = t )
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...