Section 4 Electrical Connections
33
Section 4 Electrical Connections
4.1 Detector
Switch evaluation unit off before connecting the scintillation
counter.
Open the screws and remove the connection box cover to expose
the connection area.
The detector is connected to terminals
1
and
2
on the evaluation unit via a 2-wire
(2 x 1 mm
2
) shielded standard cable with
6 mm diameter. This cross-section allows
a maximum length of 750 m. When in-
stalling the connection cable, you have to
make sure that water cannot get into the
connection room via the cable. With am-
bient temperatures >70°C, the installed
cable has to be protected to prevent ex-
ceeding of the temperature limits of the
cable. Following connection, check that
the connection room is carefully closed
and the cable bushing properly sealed.
With a rod detector, a 6 m longer cable
has to be connected to determine the
background.
See also page 68 "Background".
Figure 22: Cable connections at detector
For equipment installed in the Ex-area, please observe the
special requirements for the cable and the preparation of
the connection wires.
The detector LB 44... has to be used for installation in the
Ex-area.
The evaluation unit must always be installed outside the Ex-
area.
A special transmission technique ensures that interference will be
suppressed. Nevertheless, the cable should not be installed to-
gether with power cables.
1
2
3
4
5
Connections
in detector
to evaluation
unit LB 442
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...