background image

2B Technologies   

2100Central Ave Suite 105, Boulder, Colorado 80301 USA                                                Model 306 Quick Start Guide Rev B 

Phone 303-273-0559 Fax 303-277-1812 http://www.twobtech.com 

2

B

 

Technologies 

 

Model 306 Start Up Instructions 

 

PLEASE READ BEFORE ATTEMPTING 

ANY MEASURMENTS WITH THE MODEL 306 

 

Before using the Model 306 in your application, please perform the following steps to establish the 
baseline performance of  the instrument.  By following this procedure when the instrument is first 
received,  the  user  will  be  able  to  verify  that  the  instrument  has  been  setup  correctly  and,  in  the 
future,  will  be  able  to  determine  if  there  is  any  loss  in  instrument  performance  after  prolonged 
periods of usage. 
 

1.  Connect Power Source.  Use either the supplied 12 VDC power supply or a 12V battery. 

2.  Power ON the instrument. 

“Warming Up” is displayed in LCD. The amount of time the warm 

up time takes is dependent on ambient temperature. Please allow the instrument to warm 
up fully before operation. LCD will display 

“Temperature Set” when ready. 

 

                 

 

 

3.  Connect to outlet.  Locate the stainless steel bulkhead on the rear of the instrument. This 

bulkhead is the outlet for the ozone produced by the model 306. It is to this bulkhead that 
you will want to connect the provided connection tubing. Attaching the desired ozone 
monitor to the other end of the connection tubing.  

DO NOT add an overflow T on the 

connection tubing as the model 306 has an internal overflow T to compensate for 
any flow rate differential.

 

    

 

 

 

Reviews: