8.1 General Information
76
Section 8 Checking the Calibration
8.1 General Information
If deviations of the measured result occur, a new tare measure-
ment has to be performed first. To carry out a performance check
of the bulk flow measurement, you can push a calibration cap (op-
tion) over the scintillator. The load measured at empty belt with
the calibration cap must not change compared to previous tests,
provided the calibration coefficients did not change in the mean-
time.
8.1.1 Correction of Calibration
First, you should run a tare measurement and a check as described
in Section 8.
If you detect any deviations, you may correct the slope of the
curve by a multiplicative factor (see Correction of Display Value on
page 77).
8.1.2 Operating Instructions for Calibration
Start and Stop of Calibration Measurement
Push the <
run
> button to start and stop a calibration measure-
ment. With <
+
> and <
-
> you can switch to the live display. In the
live display, a push of the <
run
> button is ignored. With the <
+
>
and <
-
> buttons you can scroll in this window; the current, not yet
calibrated measured values are displayed. With <
more
> you get
back to the calibration window.
Store
When the calibration measurement has been stopped, confirm the
respective measured value with <
enter
>; otherwise it will be re-
jected when exiting the respective ‘calibration point’.
Stop Measurement
If the system is in the operating mode, the ongoing measurement
can be stopped by pushing the <
run
> button, provided the meas-
urement product is the same as the calibration product. If the se-
lected product is not the same as the measurement product, the
<
run
> button is locked. The calibration parameters for the se-
lected product can only be entered manually.
Current Output
The current output supplies a current proportional to the load and
the selected measuring range, provided the correct absorption co-
efficient has been entered.
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...