![Berthold LB 442 Operating Manual Download Page 72](http://html1.mh-extra.com/html/berthold/lb-442/lb-442_operating-manual_2739261072.webp)
7.2 Tare Measurement
70
The external tare measurement can also be interrupted or contin-
ued again by pressing the <
run
> button.
Current Output during Tare Measurement
During tare measurement the current output (26a/26c) does not
supply any current (0 mA).
Manual Input of the Tare Count Rate
You may also enter the tare count rate manually. Confirm you en-
try with <
enter
>.
Verification and Correction of the Tare Measurement
Check whether the tare value is correct by running the belt without
load for several minutes. During measurement, watch how the
value in the tonnage memory changes. If this change is too big,
you have to repeat tare measurement.
7.2.2 Tare Compensation
All changes occurring in the course of time have to be compen-
sated for by a tare measurement. This includes changes of the
conveyor belt, for example replacement of belts or chains links.
Tare must also be determined again when the belt has been re-
placed. Recalibration is not necessary.
The same applies if the source is replaced after several years.
If a tare measurement is performed after calibration, all count
rates of the calibration points are converted in accordance with the
new calculated tare count rate. As a result, the calibration curve
remains unchanged, even if it is calculated again with these val-
ues.
Therefore, a tare measurement can be carried out any time and
used for correction of the calibration.
Furthermore, one or several calibration points can be added any
time. When adding calibration points, the calibration curve has to
be calculated new (see next section).
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...