4.2 Evaluation Unit LB 442
36
-
Ext. batch measurement start
Start of external batch measurement. Relay 3 must also be set as
Batch Ready.
Start
The measurement starts when the contact is closed. The mass
counter starts at 0 t. Contact of relay 3 is open.
Stop
The measurement stops as soon as the specified batch weight is
reached. Contact of relay 3 is closed. The batch weight obtained is
held until the next start.
Digital input 2 (20a/20c):
o
External Tare
o
Print start
o
External product 3+4
o
Start / Stop and print
Input active when terminals are short-circuited.
See also
Digital input 2
page 56
-
External Tare:
Automatically starts a tare measurement (also in regular meas-
urement operation and saves the result).
-
Print start
The actual tonnage is output to the printer. The print row corre-
sponds to a row of the minute printout.
-
Product 3+4
Digital input 2 can also be used to expand the external product se-
lection. In this case, different products can be selected as shown in
the table below:
Menu
Dig. input 2
Dig. input 3
1
0 0
2
0 1
3
1 0
4
1 1
1 = closed contact
0 = open contact
Table for external product selection 3+4
-
Start/Stop and print
If the contact is closed, a tare measurement is carried out first.
Then the measurement automatically changes over to the meas-
urement mode. The measurement mode is interrupted as soon as
the contact is opened. After the measurement, a printout is cre-
ated automatically, including date, time and measured tonnage.
Summary of Contents for LB 442
Page 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Page 2: ......
Page 118: ...13 1 Certificates 116...
Page 119: ...Section 13 Appendix 117...
Page 120: ...13 1 Certificates 118...
Page 121: ...Section 13 Appendix 119...
Page 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Page 123: ...Section 13 Appendix 121...
Page 124: ...13 1 Certificates 122...
Page 125: ...Section 13 Appendix 123...
Page 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Page 127: ...Section 13 Appendix 125...
Page 128: ...13 1 Certificates 126...
Page 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Page 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Page 133: ...Section 13 Appendix 131...
Page 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Page 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Page 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Page 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...