SpinLite® Full Side Washer
1MANUL961
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
43
Installation
Install Hub Assemblies, LED Lights with Electrical Connections & ShineMitts
™
Connect LED Lights to Wire Harness
4) Apply dielectric grease to the receptors on the LED light assemblies.
5) Align the indicators on the LED lights and Wire Harness Plugs and press them together gently in
order to not bend the pins.
6) Wrap the LED connections with electrical tape to protect them from the car wash elements.
7) Tuck the LED connections into the holes in the Hub Plates then secure the LED Wires to the top
of the Hub Plates by using the Retainer Clips.
8) Place the Hub Covers (two half covers per Hub Assembly) over the Hub Plates and secure the
Hub Covers to the Hub Plates as described in the image below.
Align the indicators and
press the connectors
together gently. Wrap
connections with
electrical tape.
Step 5 & 6:
Apply dielectric grease
to the LED Receptors.
Step 4:
Step 8:
Insert the sleeve into the
mounting holes and secure
the Hub Covers to the Hub
Plates.
Hub Covers
Hub Plates
Tuck the LED Connections into the Hub
Plates and secure the LED Wires to the
Hub Plates with the Retainer Clips.
Step 7:
Retainer Clips
Hub Plates