Installation
Install Hub Assemblies, LED Lights with Electrical Connections & ShineMitts
™
Load ShineMitts
™ on Hub Assemblies
Next, the ShineMitt™ Cleaning Material will be loaded onto each of the SpinLite® Full Side Washers.
Then the Hub LED Light assemblies will be connected to the Wire Harness and the Hub Plates and
Hub Covers will be reattached to complete the assembling of the Hubs.
1) Locate ALL of the
ShineMitt™ Cleaning Material. Included are three different lengths of the
ShineMitt™ in varying amounts. There are 80 pieces of the 19” ShineMitt™ (111060), 64 pieces
of the 22” ShineMitt® (111053), and 32 pieces of the 25” ShineMitt™.
Note:
It is imperative that the ShineMitt™ cleaning material is loaded onto the driver side and
passenger side hubs in the directions specified to properly clean the vehicle and to prevent
damage to the equipment and/ or vehicle.
19” ShineMitt™: 111060
Qty. 80 pcs
22” ShineMitt™: 111053
Qty. 64 pcs
25” ShineMitt™: 111369
Qty. 32 pcs
Passenger Side
SpinLite® FSW
ShineMitt™
Cleaning Material
Hub Plates &
Hub Covers
Driver Side
SpinLite® FSW