Installation
Connect LED Power Cable to Slip Ring
Each SpinLite® FSW assembly has an electrical Slip Ring and Wire Harness to power the LEDs on the
Hub. An LED Power Cable for the Slip Ring has been pre-routed through each of the Arm Assemblies. For
both the driver and passenger side SpinLite® FSW assemblies do the following:
1) Route the LED and Motor Power Cables from the Arm Assembly up into the Motor Cover.
2) Locate the Slip Ring Wire and apply dielectric grease to the receptor to help protect the
connection from water intrusion.
3) Align the indicators on the Slip Ring receptor and the LED Power Cable plug and gently push
the connectors together, as shown in the image above on right. Wrap the connection with
electrical tape to protect it from the car wash elements.
4) Either reattach the top cover of the Motor/Gearbox Cover now or keep it in a safe place until
after the electrical connections are completed on the Motor.
Note:
When making the wire connections be sure to use the indicators to align them correctly; they
should go together easily. DO NOT force a connection it may bend the pins in the connector
which may result in some or all of the LEDs not working.
Motor/ Gearbox Cover
Slip Ring
LED Power
Cable
Locate the Slip Ring
Wire inside the
Motor/Gearbox
Cover.
Step 2a:
Slip Ring Wire
Apply dielectric
grease to the Slip
Ring Wire Receptor.
Step 2b:
Arm Assembly
Slip Ring
Conduit
Length: 5.125”
LED & Motor Cables
Slip Ring Wire
Route the LED & Motor
Power Cables up into
the Motor Cover.
Step 1:
Align the indicators
and press the
connectors together
gently.
Step 3: