Operation
09|2019
EN 43
Up to 10 different filter times can be defined under Timer.
The filter time is set by a switch-on time and a switch-off time. The
pump runs in the set switching stage (1, 2 or 3) during the
corresponding time period. The filter times can also be set
individually for the days of the week. If a filter timeout is
programmed, the filter time with the higher speed is always given
priority.
In order to maintain continuous filter pump operation, the timer
must always be programmed as in the following example. In filter
time 1, the switching time OFF must be identical with the
switching time ON in filter time 2. Of course, the times are only
examples.
Summary of Contents for Genio
Page 3: ...DE DE DE Originalbetriebsanleitung BADU Genio...
Page 70: ......
Page 71: ...EN EN EN Translation of original operation manual BADU Genio...
Page 136: ......
Page 137: ...FR FR FR Traduction des instructions d utilisation originale BADU Genio...
Page 159: ...Installation 09 2019 FR 23 Entr e de c ble externe...
Page 206: ......
Page 207: ...IT IT IT Traduzione del manuale d istruzioni originali BADU Genio...
Page 228: ...Installazione 22 IT 09 2019 Passacavo esterno...