
Installation
09|2019
EN 15
ATTENTION!
The relay load must be observed for this! A pump
with too high a current consumption can damage the relay. An
additional contactor and motor protection must be installed. This
also applies for three-phase current pumps.
Relay 5
Backflushing
NO (normally open)
Relay 6
Rinsing
NO (normally open)
Relay 7
Emptying
NO (normally open)
Relay 8
Circulation
NO (normally open)
Relay load
AC3
250 V/2 A
AC1
250 V/10 A
Assignment of the digital inputs on the RasPI
Only use the 12 V from terminal X2:1-4 for digital inputs.
Maximum current load 200 mA.
I01
Chlorine canister empty message
I02
pH canister empty message
I04
Pressure switch
I05
Level switch
I06
Enable BADU Omni actuating drive
I07
Switch for emptying
I09
Button for attraction 1
I10
Button for attraction 2
I11
Button for attraction 3
I12
Factory settings (5 s)
X8 Fuses; 230 V power supply
X8:F1 (T 1.25 A)
Fuse 5 V Raspberry Pi
X8:F2 (T 6.3 A)
Fuse terminal strip X8:L; power supply unit
24 V
BADU Genio external wiring
Relay connection designation (left-middle-right) looking at the
screw terminal from the front.
Low voltage
Inputs for attractions when switched by piezo/PN switch
additionally to the app.
Button1/Attraction1
Conductor1
X2:1 (12V)
Conductor2
I09
Summary of Contents for Genio
Page 3: ...DE DE DE Originalbetriebsanleitung BADU Genio...
Page 70: ......
Page 71: ...EN EN EN Translation of original operation manual BADU Genio...
Page 136: ......
Page 137: ...FR FR FR Traduction des instructions d utilisation originale BADU Genio...
Page 159: ...Installation 09 2019 FR 23 Entr e de c ble externe...
Page 206: ......
Page 207: ...IT IT IT Traduzione del manuale d istruzioni originali BADU Genio...
Page 228: ...Installazione 22 IT 09 2019 Passacavo esterno...