Operation
09|2019
EN 45
If a switching time overlap is programmed, the switching time with
the higher speed stage is always given priority. You can see in
this example that filter time 2 runs between 3 pm and 6 pm in
speed stage 3.
If the filter pump switches to the “Off” mode due to the set filter
time, the pump initially runs in “Lag time” (speed stage 1). The
dosing pumps are locked and the heating relay switches off. The
filter pump switches off at the end of the 30-seconds lag time.
Summary of Contents for Genio
Page 3: ...DE DE DE Originalbetriebsanleitung BADU Genio...
Page 70: ......
Page 71: ...EN EN EN Translation of original operation manual BADU Genio...
Page 136: ......
Page 137: ...FR FR FR Traduction des instructions d utilisation originale BADU Genio...
Page 159: ...Installation 09 2019 FR 23 Entr e de c ble externe...
Page 206: ......
Page 207: ...IT IT IT Traduzione del manuale d istruzioni originali BADU Genio...
Page 228: ...Installazione 22 IT 09 2019 Passacavo esterno...