Installation
09|2019
EN 13
5
Installation
5.1
Installation site (Qualified specialist)
5.1.1 Installation site
The switch box should be installed in the control room. It can
be fixed there in any place you wish. See the drawing in
section 10 for fastening dimensions.
5.1.2 Space requirements
Leave enough space to remove the lid and easily access the
plugs. See the dimensional drawing in section 10.
5.1.3 Fastening elements
Fix the switch box with screws.
5.2
Electrical connection (Qualified specialist)
WARNING
Risk of electric shock due to incorrect connections!
Electrical connections must always be carried out by
authorised specialists.
Observe VDE and utility company regulations.
Install a disconnecting device with at least a 3 mm contact
gap per pole to interrupt the power supply.
Protect power supply with a ground fault circuit interrupter,
nominal residual current I
FN
≤ 30 mA.
Only use suitable cable types. Observe functional integrity
class E90 or higher.
Adjust minimum diameter of the electrical pipes to
accommodate the motor output and pipe length.
Do not bend or squash the pipes.
If hazardous situations can occur, provide an emergency off
switch according to DIN EN 809. The builder/operator must
make a decision according to this standard.
Summary of Contents for Genio
Page 3: ...DE DE DE Originalbetriebsanleitung BADU Genio...
Page 70: ......
Page 71: ...EN EN EN Translation of original operation manual BADU Genio...
Page 136: ......
Page 137: ...FR FR FR Traduction des instructions d utilisation originale BADU Genio...
Page 159: ...Installation 09 2019 FR 23 Entr e de c ble externe...
Page 206: ......
Page 207: ...IT IT IT Traduzione del manuale d istruzioni originali BADU Genio...
Page 228: ...Installazione 22 IT 09 2019 Passacavo esterno...