7.1 Executing a Test Switch Using
the CP-10 Control Panel
The following test switch routes Input 2 to Output 1 on Level 0. Before
executing these switches, make sure the first two inputs and outputs are
connected exactly as shown on the AutoPatch “8Y-XL Connector and
Groupings Guide.”
To execute a test switch using the CP-10 Control Panel:
1. At the Command screen, press the Change key.
The Change screen appears.
2. Press the Level key and enter “0” (your system may have been
programmed with a different level).
3. Press the Input key and enter “2.”
7-2
Installation and Setup Guide
Executing a Test Switch
Test
Switch