
3 . Operating Procedure
115
ML-3030AS/3015AS
Chapter 3 Laser W
elding by Control Panel (P
ANEL
CONTROL)
Introduction Part
Installation
and
Preparation
Part
Operating Part
Maintenance Part
Appendixes
<Note>
The settable value of laser output peak value differs depending on the model. For
the laser output value setting (% of FLASH), set a value not exceeding the maxi-
mum value . For the laser output value setting (% of FLASH), set a value within the
setting range .
ML-3030AS: 0 .5 to 2 .7 kW (FIX/FLEX)
50 to 270 W (CW)
ML-3015AS: 0 .25 to 1 .35 kW (FIX/FLEX)
25 to 135 W (CW)
(4) Press the "TIME [ms]" setting button of "FLASH1."
Enter the laser output time (ms) by using the numeric keypad and then press the
ENT key.
In this example, set 30.0 ms in "FLASH1."
<Note>
Set the laser output time so as to result in the following value .
0.2 ms ≤ "FLASH1" + "FLASH2" + "FLASH3" ≤ 50.0 ms
(5) Press the "
SLOPE" setting button.
Enter the time "TIME [ms]" required for laser light to up-slope (get gradually
stronger) in FLASH1 by using the numeric keypad, and then press the ENT key.
In this example, set 10.0 ms.
<Note>
Set "
SLOPE" so as to result in the following value .
SLOPE
≤
FLASH1
When setting "FLASH2" or "FLASH3", set the time required for laser light to down-
slow (the laser output is gradually weaker) to FLASH . Set "
SLOPE" so as to re-
sult in the following value .
SLOPE
≤
FLASH1, FLASH2, FLASH3
(6) Press the "POWER [%]" setting button of "FLASH1."
Enter the laser output value (%) by using the numeric keypad and then press the
ENT key.
In this example, set 50.0% in "FLASH1."
⇒
For the laser output value, set the ratio (%) supposing that the set laser output
peak value is 100%. In this example, this peak value is 50% of "PEAK POW-
ER=1.000 kW", so that the actual laser output value is 0.500 kW. In this case,
even if "PEAK POWER=0.500 kW" and "FLASH1 100 ms 100%" are set, the ac-
tual laser output value is the same.
Summary of Contents for ML-3015AS
Page 21: ...Introduction Part...
Page 22: ......
Page 30: ......
Page 36: ......
Page 37: ...Installation and Preparation Part...
Page 38: ......
Page 52: ......
Page 53: ...Operating Part...
Page 54: ......
Page 163: ...Maintenance Part...
Page 164: ......
Page 175: ...Appendixes...
Page 176: ......