105
017-882-B0-001 Rev. E (06/2018)
4.0 Maintenance, Continued
4.4 PM Certification Report
Follow this sample when filling out the maintenance log (following page).
Fig. 4-5, PM Certification Report, Page 1
Site Data
DEMO
Site ID: EXAMPLE PM CERT
Latitude
Longitude
Date
Feb. 05, 2014
Time
02:53 PM
Transformer #
Hub
City
State /
Province
Zip Code
Region
System
Node
Country
USA
Project ID
Street(s)
Address Notes
Pole #
Business
Service
Output VAC
120V Or 240V?
Powering
A Node
Utility
Company
Utility Account #
Utility Meter #
Transponder Data
CM Mac
Address
SNR
CER
Logic Card
Transmit
Power
Receive
Power
CM IP
Address
Transponder
Type
Firmware
Version
T3
Timeouts
T4
Timeouts
SNMP TRAPS
Trap 1
Trap 2
Trap 3
Trap 4
Alpha MIB 1
Alpha MIB 2
Alpha MIB 3
Alpha MIB 4
UPSTREAM
Frequency
Modulation
Lock
Channel ID
Symbol Rate
DOWNSTREAM
Frequency
Modulation
Lock
Channel ID
Symbol Rate
Power Supply #1 Data
Make-Model
Date Code
(MMYY)
Refurb Date
(MMYY)
PIM/DOC
Installed
Firmware
Version
Total
Run Days
Controller
Card
Serial
Number
Self-Test
Duration (min)
Self-Test
Interval (days)
Retry Limit
Retry Delay
(Seconds)
Event Log
Cleared
Number Of
Events
Events Time
Inverter Test
Performed
AC Input
Voltage (VAC)
Output
Voltage (VAC)
Output
Current 1 (A)
Output
Current 2 (A)
Battery Data
Self-Test
Verified
Self-Test
Start Time
Self-Test
Finish Time
Battery Temperature
(°F / °C)
Battery #
Battery Manufacturer
Date Code
(MMYY)
ID #
Voltage No
Load (VDC)
Voltage Under Load (VDC)
After 9 Minute Self-Test
BS Conductance (mhos)
Meter Reading
Corrected 77°F
A1
A2
A3
A4
Battery
Separator Present
String A Total
String A Fused
B1
B2
B3
B4
Battery
Separator Present
String B Total
String B Fused
CHARGER INFO
Charger
Mode
Current (A)
Accept (V/C)
Current
Limit (A)
Float (V/C)
Temp Comp
(mV/C/°C)