DRS27 User’s Guide
Chapter 4: Software Overview
0025.00.902
4-29
Process Heating
Z-Axis Hot Gas - Heater
Function:
Turns on or off the upper heater.
Action:
The air flow (flow control) and temperature are selected. The upper heater is activated.
Task Properties:
Flow Control (%):
Controls the air/nitrogen flow from the mass flow controller to the upper heater
(20-100%). The settings generally correspond to the nozzle size. Recommended flows:
Nozzle Size (mm)
Heater Flow (%)
Less than 10*
30
*For MNX nozzles set the flow to 60%
10-15
40
16-26
50
27-30
55
31-34
65
35-40
75
40+
85
Use Heater By-Pass Control:
Indicates by-pass system is activated. Ambient air flows through the
nozzle by passing the heating element. Generally, used to cool component, package and joints in the
replacement program after peak reflow temperature is reached. This minimizes/controls the time from
reflow 1 (peak temperature) to end of reflow 2 (just below melting temperature).
Temperature (º C):
Sets the upper heater temperature.
Wait For Heater In-Position:
Indicates wait for heater in-position function is activated. A separate
thermocouple in the heater can be used to insure the temperature programmed is reached prior to a
process.
In-Position Delay (sec):
Used in conjunction with wait for heater in-position. Indicates the time after
the temperature is reached prior to a process.
Use Heater Ramp
: Indicates use heater ramp function is activated.
Summary of Contents for DRS27
Page 1: ...DRS27 ...
Page 2: ......
Page 4: ......
Page 6: ...DRS27 User s Manual Table of Contents 0027 00 902 ...
Page 8: ...DRS27 User s Guide Chapter 1 Introduction Overview 0027 00 902 1 2 ...
Page 26: ...DRS27 User s Guide Chapter 1 Introduction Overview 0027 00 902 1 20 ...
Page 28: ...DRS27 User s Guide Chapter 2 Requirements and Installation 0027 00 902 2 2 ...
Page 64: ...DRS27 User s Guide Chapter 3 Machine Function Verifications 0027 00 902 3 2 ...
Page 88: ...DRS27 User s Guide Chapter 4 Software Overview 0025 00 902 4 2 ...
Page 178: ...DRS27 User s Guide Chapter 5 Process Development Guide Engineering Training 0027 00 902 5 2 ...
Page 215: ...DRS27 User s Guide Chapter 5 Process Development Guide Engineering Training 0027 00 902 5 39 ...
Page 222: ...DRS27 User s Guide Chapter 6 Templates Removal Site Clean Replacement 0027 00 902 6 2 ...
Page 258: ...DRS27 User s Guide Chapter 7 Operator Training 0027 00 902 7 2 ...
Page 302: ...DRS27 User s Guide Chapter 8 Maintenance 0027 00 902 8 2 ...
Page 309: ...DRS27 User s Guide Chapter 8 Maintenance 0027 00 902 8 9 8 4 Assembly Diagrams ...
Page 310: ...DRS27 User s Guide Chapter 8 Maintenance 0027 00 902 8 10 ...
Page 328: ......
Page 330: ...DRS27 User s Guide Chapter 9 Schematics 0027 00 902 9 2 ...
Page 332: ......
Page 334: ......
Page 336: ......
Page 338: ......
Page 340: ......
Page 342: ......
Page 344: ......
Page 346: ......
Page 348: ......
Page 350: ......
Page 352: ......
Page 354: ......
Page 356: ......
Page 358: ......
Page 360: ......
Page 362: ......
Page 364: ......
Page 366: ......
Page 368: ......
Page 370: ......
Page 372: ......
Page 374: ......
Page 376: ......
Page 378: ......
Page 380: ......
Page 382: ......
Page 384: ......