MAINTENANCE
Condor-UM-2011-21-R0-en-us-20210108
151
6.6
Maintenance schedule
Maintain the machine according to the next maintenance schedules (for some subjects you must
contact your dealer).
The total number of operating hours can be requested on the main screen
(
109
).
6.6.1
Initial maintenance
One time maintenance after the first operating hours of a new machine. Continue with the regular
maintenance of these subjects after the initial maintenance.
Subject
First operating hours
U
s
e
r
D
e
a
le
r
1
0
1
0
0
–
1
5
0
1
5
0
3
0
0
-
-
Retighten the wheel nuts with a torque wrench
187
Retighten the bolts of the spray boom with a torque
wrench
234
Change the oil in the wheel gearboxes
183
Replace the oil filter cartridge on the hydraulic pumps.
Standard: 1 cartridge.
In case of an AirFlowPlus-boom: 2 cartridges
Replace the oil filter element in the hydraulic oil tank
Spray pump (Comet)
∗∗
: change the oil
194
∗∗
If applicable
Summary of Contents for Condor C03
Page 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Page 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Page 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Page 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Page 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Page 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Page 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Page 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Page 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Page 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Page 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...