OPERATION
Condor-UM-2011-21-R0-en-us-20210108
107
5.21.1
Acres / time / working width correction
1
2
3
10
9
8
112
7
6
5
13
14
15
16
11
4
1.
In FIELD MODE: press the button
(pushbutton [1],
95
).
2.
The screen page above appears.
Measured since the last reset:
[1] = Sprayed surface in acres (ac).
[2] = Sprayed surface in acre per hour (ac/h). Measured over the spray time.
[3] = Sprayed surface in acre per hour (ac/h). Measured over the elapsed time.
[4] = Sprayed liquid in gallons (gal).
Measured since the start-up of the machine:
[5] = Sprayed surface in acre (ac).
[6] = Sprayed surface in acre per hour (ac/h). Measured over the spray time.
[7] = Sprayed surface in acre per hour (ac/h). Measured over the elapsed time.
Measured since the last reset:
[8] = The spray time in hours (h).
[9] = The elapsed time in FIELD MODE in hours (h).
[10] = The elapsed time in ROAD MODE in hours (h).
Summary of Contents for Condor C03
Page 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Page 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Page 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Page 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Page 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Page 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Page 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Page 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Page 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Page 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Page 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...