OPERATION
130
Condor-UM-2011-21-R0-en-us-20210108
No.
Description
Status
B/C
∗
Induction hopper.
Press the button below the symbol
to open
or close the induction hopper valve.
CLOSED
OPEN
Failure
B/C
Suction filter and pressure filter.
Cleaning or replacing the filter elements.
Do not clean or
replace the filter
elements
Clean or re-
place the filter
elements
195
196
Failure
C
∗
Filling program.
Display [C] appears after the filling program (op-
tion) is selected on the main screen in the cab.
Press the button below the symbol
to start or
interrupt the filing program. If the program is not
interrupted, the spray tank is filled to the desired
contents. The clean water tank is completely
filled.
Start / interrupt
135
Filling active
Failure
------
Desired con-
tents
∗
Option
Summary of Contents for Condor C03
Page 14: ...14 Condor UM 2011 21 R0 en us 20210108 ...
Page 18: ...SAFETY 18 Condor UM 2011 21 R0 en us 20210108 ...
Page 19: ...SAFETY Condor UM 2011 21 R0 en us 20210108 19 ...
Page 54: ...START UP 54 Condor UM 2011 21 R0 en us 20210108 ...
Page 144: ...OPERATION 144 Condor UM 2011 21 R0 en us 20210108 ...
Page 218: ...TROUBLESHOOTING 218 Condor UM 2011 21 R0 en us 20210108 ...
Page 220: ...ENVIRONMENT 220 Condor UM 2011 21 R0 en us 20210108 ...
Page 222: ...DISPOSAL PHASE 222 Condor UM 2011 21 R0 en us 20210108 ...
Page 232: ...SPECIFICATIONS 232 Condor UM 2011 21 R0 en us 20210108 ...
Page 233: ...APPENDICES Condor UM 2011 21 R0 en us 20210108 233 11 APPENDICES ...
Page 248: ...APPENDICES 248 Condor UM 2011 21 R0 en us 20210108 ...