
2-4
N9360A Multi UE Tester GSM Programming Manual
2
Caution and Safety Requirements
When Operating The Tester
C A U T I O N
Make sure that the input signal level does not exceed the maximum
level allowed. Tester failure may result otherwise.
C A U T I O N
Do not turn off the Line switch on the rear panel of the Tester while
the LINE LED on the front panel of the Tester is lit in green.
Otherwise, Tester failure may occur.