This appendix describes the installation requirements,
installation procedures and checks.
i. Installation requirements.
Space requirements.
The drawings show the minimum requirements
from a safety viewpoint.
Refer to drawing i-1 for space requirements.
Each drawing has 2 sets of dimensions:
1 from the walls to the center of the holes (on the
left and top of the drawing);
2 from the walls to the side of the cabinet (on the
right and bottom of the drawing).
Floor requirements.
The floor should be:
- horizontal; within 2°
- level; within 2 mm
- able to bear the weight of the balancer as stated
in Chapter 2 of the Operator’s Manual.
The floor on which the balancer will be installed
should not relay vibrations from other devices or
from outside the building. External vibrations will
affect the accuracy of the balancer.
Note:
The balancer should be positioned on the
floor directly. Do not use shims to fill gaps.
If the above conditions are met, you do not need to
secure the balancer to the floor, however if for
optimal performance balancer should be lagged to
the floor to prevent any accidental vibrations or
movement.
Power supply requirements.
Refer to Chapter 2 of the Operator’s Manual for mains
power requirements.
WARNING: ENSURE THAT AN APPROVED WALL
MAINS OUTLET IS AVAILABLE.
WARNING: NEVER LAY POWER SUPPLY CABLES
OVER THE FLOOR, UNLESS PROTECTED BY
AN APPROVED COVER.
Summary of Contents for 1220
Page 72: ...72 ACCU 1220...
Page 82: ...82 ACCU 1220 090 c May03...
Page 86: ...86 ACCU 1220 090 c May03...
Page 87: ...87 ACCU 1220 090 c May03...
Page 88: ...88 ACCU 1220 090 c May03...
Page 89: ...89 ACCU 1220 090 c May03...
Page 90: ......
Page 91: ......
Page 92: ...92 ACCU 1220 090 c May03...
Page 93: ...93 ACCU 1220 090 c May03...
Page 94: ...94 ACCU 1220 090 c May03 BLANK PAGE...
Page 95: ...95 ACCU 1220 090 c May03 BLANK PAGE...
Page 96: ...ACCU TURN 1220 Rev E...