76
ACCU 12
2
0
Installation Instructions
Operator’s Manual
ii-1
ii-2
ii Handling, unpacking and contents.
Handling.
The wheel balancer is supplied on a pallet.
•
Use a pallet truck (Figure ii-1) to bring the wheel
balancer to its working area.
Unpacking.
WARNING: PREVENT THE STRAPS FROM
SPRINGING LOOSE AFTER BEING CUT.
•
Cut the straps.
•
Open the top of the box.
•
Remove staples at the bottom of the box. Lift the
box up and over the unit.
•
Carefully unwrap the balancer and supplied parts.
•
Check the contents of the shipment.
Contents.
The shipment contains:
- a wheel balancer
- a Declaration of Conformity (CE)
- the accessories as mentioned in Chapter 3 of
the Operator’s Manual.
- 4 supports and disks for accessories
Tools required.
- bar (diameter 4.5-5 mm)
- Allan wrenches: 13, 17 mm
Positioning.
•
Remove the bolts that secure the wheel balancer
on the pallet.
CAUTION: DO NOT LIFT OR MOVE THE WHEEL
BALANCER BY THE MAIN SHAFT OR
MEASURING HEAD.
•
Refer to Figure ii-2. Move the wheel balancer from
the pallet to its working location.
Note:
Use the accessory supports (mount as
indicated in Chapter iii) and/or wheel
guard shaft (if present) when handling the
unit.
Summary of Contents for 1220
Page 72: ...72 ACCU 1220...
Page 82: ...82 ACCU 1220 090 c May03...
Page 86: ...86 ACCU 1220 090 c May03...
Page 87: ...87 ACCU 1220 090 c May03...
Page 88: ...88 ACCU 1220 090 c May03...
Page 89: ...89 ACCU 1220 090 c May03...
Page 90: ......
Page 91: ......
Page 92: ...92 ACCU 1220 090 c May03...
Page 93: ...93 ACCU 1220 090 c May03...
Page 94: ...94 ACCU 1220 090 c May03 BLANK PAGE...
Page 95: ...95 ACCU 1220 090 c May03 BLANK PAGE...
Page 96: ...ACCU TURN 1220 Rev E...