The residual current, out on the line, is calculated at an operational case with minimal earth-
fault current. The requirement that the whole line shall be covered by step 2 can be formulated
according to equation
.
step2
0
I
0.7 3I (at remote busbar)
³
×
EQUATION1202 V4 EN-US
(Equation 487)
To assure selectivity the current setting must be chosen so that step 2 does not operate at
step 2 for faults on the next line from the remote substation. Consider a fault as shown in
Figure
IN
>
One phase-to-earth
fault
3I
0
IN
>
3I
01
IEC05000155-en-2.vsd
IEC05000155 V3 EN-US
Figure 281: Step 2, selectivity calculation
A second criterion for step 2 is according to equation
.
1
1
0
step2
step1
0
3I
I
.2
I
3I
³
×
×
EQUATION1203 V4 EN-US
(Equation 488)
where:
I
step1
is the current setting for step 1 on the faulted line.
Step 3
M15282-164 v6
This step has directional function and a time delay slightly larger than step 2, often 0.8 s. Step
3 shall enable selective trip of earth faults having higher fault resistance to earth, compared to
step 2. The requirement on step 3 is selectivity to other earth-fault protections in the network.
One criterion for setting is shown in Figure
IEC05000156-3-en.vsd
IN
>
One phase-to-
earth fault
3I
0
IN
>
3I
02
IEC05000156 V3 EN-US
Figure 282: Step 3, Selectivity calculation
1MRK 505 343-UEN B
Section 8
Current protection
427
Application manual
Summary of Contents for Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 1 IEC Application manual...
Page 2: ......
Page 40: ...34...
Page 64: ...58...
Page 150: ...144...
Page 406: ...400...
Page 472: ...466...
Page 494: ...488...
Page 512: ...506...
Page 524: ...518...
Page 604: ...598...
Page 686: ...680...
Page 718: ...712...
Page 722: ...716...
Page 758: ...752...
Page 759: ...753...