User’s Manual 1PH HYD3000-HYD6000-ZP1
Rev. 1.0 01/09/2023
Identification: MD-AL-GI-00
Rev. 1.1 of 27/01/2023 - Application: GID
32/193
Fixed installation between modules
:
Procedure
:
Step 1:
Align the first battery module on the floor pedestal.
Step 2:
Install connectors on both sides and tighten the six screws using a cross screwdriver.
Step 3:
Install the remaining battery modules and inverters from bottom to top. (Before installing the next
module, ensure that the screws on the side connectors of the previous module are firmly installed.)
Figure 13 – Battery module and inverter installation diagram