User’s Manual 1PH HYD3000-HYD6000-ZP1
Rev. 1.0 01/09/2023
Identification: MD-AL-GI-00
Rev. 1.1 of 27/01/2023 - Application: GID
31/193
Pedestal installation
Procedure
:
Step 1:
Place the pedestal against a wall and keep it 10 to 25mm away from the wall. Adjust the hole positions
using a level, and mark the hole positions using a marker.
Step 2:
To install the pedestal, remove the pedestal, drill holes using a hammer drill (φ 8mm, depth range 60
-
65 mm), and tighten expansion screws to ensure that the base is securely installed.
Step 3:
Use a marker to mark holes for securing the battery modules and inverters based on the dimensions
shown in below Figure.
Figure 12 – Podestal installation
If holes cannot be drilled on the ground,the battery
expansion modules must be secured on the wall
Levelling instrument
Wall
Ground
Baseboard
60mm
10~25mm
Left
Right
A
Enlarged drawing A
M6
5 N·m
First Battery
PACK
Second Battery
PACK
Third Battery
PACK
Inverter
①
②
③