6.7 Operation Sequence
6-57
6.7.2 Operation Sequence for Managing Parameters
Using SERVOPACK
When the parameters are managed by SERVOPACK E
2
PROM, the operation is performed in two steps.
Step 1: Saving parameters (during set-up)
Step 2: Ordinary operation sequence
* 1. If communication disconnects normally, the NOP command is sent. If communication does not dis-
connect normally, the DISCONNECT command is sent for two or more communications cycles prior
to connection, then the CONNECT command is sent.
* 2. Do not use PRM_WR.
* If communication disconnects normally, the NOP command is sent. If communication does not
disconnect normally, the DISCONNECT command is sent for two or more communications cycles
prior to connection, then the CONNECT command is sent.
Proce-
dure
Item
Command
Description
Phase
1
Turn ON control power
supply.
NOP/DISCONNECT
*1
Turn ON power supply.
1
3
Establish connection.
CONNECT
Establish communications.
Start the WDT count.
2 or 3
4
Check information
such as device ID.
ID_RD
Read information such as device type.
2 or 3
5
Set device.
PPRM_WR
*2
Set the necessary parameters such as
offline parameters to non-volatile mem-
ory.
2 or 3
6
Disconnect connection. DISCONNECT
Disconnect communications.
4 to 1
7
Turn OFF control
power supply.
−
Turn OFF power supply.
5
Proce-
dure
Item
Command
Description
Phase
1
Turn ON control and main cir-
cuit power supplies.
NOP/DISONNECT*
Turn ON power supplies.
1
2
Establish connection.
CONNECT
Establish communications.
Start the WDT count.
2 or 3
3
Check information such as
device ID.
ID_RD
Read information such as device
type.
2 or 3
4
Turn ON encoder.
SENS_ON
Turn ON encoder and obtain the
position data.
2 or 3
5
Operate main circuit.
SV_ON
Change to Servo ON.
2 or 3
6
Start operation.
.
.
.
.
.
.
Start operation.
.
.
.
2 or 3
7
Turn OFF main circuit.
SV_OFF
Change to Servo OFF.
2 or 3
8
Disconnect connection.
DISCONNECT
Disconnect communications.
4 to 1
9
Turn OFF control and main
circuit power supplies.
−
Turn OFF power supplies.
5
Содержание SGDS Sigma III Series
Страница 3: ...SGDS Sigma III Servo Amplifier User Manual for Mechatrolink II Communications...
Страница 21: ......
Страница 29: ...1 Outline 1 8 2 Connecting to SGMSH SGMGH Servomotors Power Supply Three phase 200VAC SGMGH Servomotor...
Страница 59: ...2 System Selection 2 5 4 Regenerative Resistors 2 28...
Страница 68: ...3 3 SERVOPACK Internal Block Diagrams 3 9 3 3 3 Three phase 200 V 1 0 kW...
Страница 82: ...3 7 Dimensional Drawings of Base mounted SERVOPACK Model SGDS 12A 12A 3 23 Three phase 1 5kW...
Страница 133: ...5 Wiring 5 7 2 Connecting Externally Regenerative Resistors 5 28...
Страница 229: ...7 Operation 7 7 4 Absolute Encoder Home Position Offset 7 38...
Страница 375: ...Sigma II User s Manual Index Index 8...