8-31
–
+
ELEC
E
POWER TRIM AND TILT (PTT) CONTROL SYSTEM
FUSE
Refer to “STARTING SYSTEM”.
BATTERY
Refer to “GENERAL” in chapter 3.
TRAILER SWITCH
1. Check:
●
Continuity
No continuity
→
Replace.
Switch
position
Lead color
Sky
blue
Red
Light
green
Up
Free
Down
PTT RELAY
1. Check:
●
Continuity
Out of specification
→
Replace.
PTT relay continuity:
Sky blue (Sb) – Black (B)
Light green (Lg) –
Black (B)
Continuity
Terminal
1
– Terminal
-
Terminal
2
– Terminal
-
Continuity
Terminal
1
– Terminal
+
Terminal
2
– Terminal
+
No continuity
Содержание F20A
Страница 422: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Страница 442: ......
Страница 443: ......