7-7
E
BRKT
UPPER CASE ASSY.
UPPER CASE ASSY.
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
UPPER CASE ASSY. REMOVAL
Follow the left “Step” for removal.
Lower unit
Refer to “LOWER UNIT” in chapter 6.
Bottom cowling
Refer to “BOTTOM COWLING”.
1
Lower mount housing
2
2
Lower rubber damper (side)
2
3
Lower rubber damper (front)
1
4
Ground lead
1
5
Upper damper
1
6
Upper damper retaining plate
1
7
Upper case assy.
1
Reverse the removal steps for installation.
NOTE:
Remove the lead at three different points.
Содержание F20A
Страница 422: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Страница 442: ......
Страница 443: ......