7-25
E
BRKT
PTT MOTOR, PUMP HOUSING, AND TILT
CYLINDER
PTT MOTOR, PUMP HOUSING, AND TILT CYLINDER
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
PTT MOTOR, PUMP HOUSING,
AND TILT CYLINDER REMOVAL
Follow the left “Step” for removal.
PTT unit
Refer to “POWER TRIM AND TILT (PTT)
UNIT”.
1
Bolt
4
2
PTT motor
1
3
Spring
1
4
Connector shaft
1
5
Bolt
3
6
Tilt cylinder
1
NOTE:
Removal of the tilt cylinder is not neces-
sary for cylinder repair.
Содержание F20A
Страница 422: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Страница 442: ......
Страница 443: ......