8-13
–
+
ELEC
E
IGNITION SYSTEM
IGNITION SYSTEM PEAK VOLTAGE
WARNING
When checking the CDI unit, do not touch
any of the connections of the digital tester
leads.
1. Measure:
●
CDI unit output peak voltage
Above specification
→
Replace the
ignition coil.
2. Measure:
●
Charge coil output peak voltage
Below specification
→
Replace the
stator.
3. Measure:
●
Pulser coil output peak voltage
Below specification
→
Replace the
pulser coil.
Output peak voltage:
B/W – O
r/min
Cranking
1500
3500
Opened
Closed
V
200
180
190
190
Output peak voltage:
G/W – W/G
r/min
Cranking
1500
3500
Opened
Closed
V
240
210
210
210
Output peak voltage:
R – W
r/min
Cranking
1500
3500
Opened
Closed
V
90
90
210
240
Test harness:
YB-06768/90890-06768
Содержание F20A
Страница 422: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1...
Страница 442: ......
Страница 443: ......