2. Wind pressure height change coefficient K
h
The crane operation is affected by wind speed, the higher away from the ground, the larger the
wind speed and also the wind pressure value. Ground pressure times K
h
(Wind pressure height change
coef
fi
cient), that can get wind pressures at different heights. The ground wind speed is as 14.1m/s as an
example, and the wind pressure and wind speed at different heights are shown in table 4-4.
Table4-4 Wind speed as arm frame height changing
1.13
15.03
1.00
14.1
≤
10
1.32
16.25
1.46
17.09
1.57
17.72
1.67
20.02
1.75
20.49
1.83
20.96
1.90
21.35
1.96
21.69
2.02
22.02
2.08
22.34
2.13
22.61
2.18
22.87
2.23
23.13
Height from
ground h/m
10
~
20
20
~
30
30
~
40
40
~
50
50
~
60
60
~
70
70
~
80
80
~
90
90
~
100
100
~
110
110
~
120
120
~
130
130
~
140
140
~
150
K
h
value on
land
Wind speed
v
s
m/s
Note 1: relation between crane wind pressure and wind speed:p=0.625
v
s
2
. Herein p is calculation
wind pressure, unit N/m
2
;
v
s
is average instantaneous wind speed, unit m/s.
Note 2: K
h
is wind pressure height change coef
fi
cient.
3. Operation in strong breeze
The larger the lifting weight volume and the higher the lifting height, the bigger in
fl
uence the wind
to the complete crane stability. The following conditions should be given particular attention:
a. When lifting the steel plate of larger windward area objects, the weight could hit the arm frame
leading to damage or even the crane overturning accident.
b. When no load, long arm frame and large elevation, the crane suffers the head-on wind which
may make the arm frame to fall backward, so that the crane is overturning.
Before the operation, operators must obtain wind speed and wind force information from the
meteorological department, if the wind speed exceeds the prescribed value, one should stop the operation
to avoid the risk.
The instantaneousaneous wind speed of working height is once more than
fi
ve scale, namely the
wind speed is 14.1m/s, one must stop the operation, place the lifting heavy weight onto the ground, loose
hook, arm frame is fully retracted and place it on the crane arm bracket, and shut down the engine.
When the crane operation in strong breeze, operators must carefully observe and pay attention
to wind speed, equipment state, operation environment and other aspects. In addition, operators must
consider the very big differences of speed between the ground and high altitude as well as the ground
and street area. The wind speed in here is the instantaneous wind speed. If the crane arm head is
provided with an instantaneous wind speed instrument, the instantaneous wind speed can be measured
directly, and also determined according to the objective images.
Construction instructions
Chapter 4
Содержание XCT80
Страница 1: ...Courtesy of CraneMarket com...
Страница 10: ...XCT80 Truck Crane Operation Manual VIII Courtesy of CraneMarket com...
Страница 14: ...XCT80 Truck Crane Operation Manual 1 2 LOG Chapter 1 Courtesy of CraneMarket com...
Страница 20: ...XCT80 Truck Crane Operation Manual 2 6 LOG Chapter 2 Courtesy of CraneMarket com...
Страница 31: ...XCT80 Truck Crane Operation Manual 3 11 LOG Chapter 3 Courtesy of CraneMarket com...
Страница 32: ...XCT80 Truck Crane Operation Manual 3 12 LOG Chapter 3 Courtesy of CraneMarket com...
Страница 47: ...XCT80 Truck Crane Operation Manual 4 15 LOG Chapter 4 Courtesy of CraneMarket com...
Страница 48: ...XCT80 Truck Crane Operation Manual 4 16 LOG Chapter 4 Courtesy of CraneMarket com...
Страница 80: ...XCT80 Truck Crane Operation Manual 5 32 LOG Chapter 5 Courtesy of CraneMarket com...
Страница 104: ...XCT80 Truck Crane Operation Manual 6 24 LOG Chapter 6 Courtesy of CraneMarket com...
Страница 124: ...XCT80 Truck Crane Operation Manual 7 20 LOG Chapter 7 Courtesy of CraneMarket com...
Страница 142: ...XCT80 Truck Crane Operation Manual 8 18 LOG Chapter 8 Courtesy of CraneMarket com...
Страница 176: ...XCT80 Truck Crane Operation Manual 9 34 LOG Chapter 9 Courtesy of CraneMarket com...
Страница 206: ...XCT80 Truck Crane Operation Manual 10 30 LOG Chapter 10 Courtesy of CraneMarket com...
Страница 215: ...XCT80 Truck Crane Operation Manual 11 9 LOG Chapter 11 Courtesy of CraneMarket com...
Страница 216: ...XCT80 Truck Crane Operation Manual 11 10 LOG Chapter 11 Courtesy of CraneMarket com...
Страница 235: ...XCT80 Truck Crane Operation Manual 12 19 LOG Chapter 12 Courtesy of CraneMarket com...
Страница 236: ...XCT80 Truck Crane Operation Manual 12 20 LOG Chapter 12 Courtesy of CraneMarket com...
Страница 241: ...XCT80 Truck Crane Operation Manual 13 5 LOG Chapter 13 Courtesy of CraneMarket com...
Страница 242: ...XCT80 Truck Crane Operation Manual 13 6 LOG Chapter 13 Courtesy of CraneMarket com...
Страница 244: ...XCT80 Truck Crane Operation Manual 14 2 14 1 Appendix Chapter 14 Courtesy of CraneMarket com...
Страница 249: ...XCT80 Truck Crane Operation Manual 14 7 LOG Chapter 14 Courtesy of CraneMarket com...
Страница 250: ...Powered by TCPDF www tcpdf org Courtesy of CraneMarket com...