Shadow VI User Manual
1107200
Installation and Checkout
Chapter 2
page 55
FSD1
(1-3)
FSD2
(4-6)
(7-9)
TB4
GND
N/C
N/O
Co m.
N/C
Co m.
N/O
factory-installed jumper
across #3 and #5
N/C
Co m.
N/O
Status output
Stop output
Figure 2-20. Wiring "Upper" TB4 Connector in Control
7. Once you have completed the wiring of the relays (according to step 6), remember to
leave a service loop at the control to allow for later adjustment of the conduit. Cut the
wires as necessary.
Keep going in this section to connect to WPC or a PLC. If you do not need to perform either
if these installation procedures, skip to the next section "Making settings inside the control".
NOTICE
Guidelines for making these connections are covered in these steps:
8A.
Wiring Shadow to the WPC
8B.
Wiring Shadow to a programmable logic controller (PLC)
8A.
Wiring Shadow to the WPC (One or Two Control Boxes)
If you are connecting the control to WPC, see Figure 6 at the end of this manual. To connect
2 control boxes, refer to Figure 7 also found at the end of the manual. It shows how Shadow
must be connected to the resolver-based WPC. If you have a WPC 1000 see Figure 10 at the
end of the manual. If you have an older-model WPC, refer to Figure 9 at the end of the
manual.
Once you make connections, proceed to the next section "Making settings inside the
control".
If you have the optional Shadow VI-WPC control board, refer to Appendix C and
Figure 8 for specific instructions.
Содержание Shadow VI
Страница 142: ...1107200 Shadow VI User Manual page 130 Appendix C Installation of Shadow VI WPC Control Board ...
Страница 144: ...1107200 Shadow VI User Manual page 132 Appendix D Replacement Parts ...
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......