10.5.2
Fuel rail - do a check of the pressure control valve
Periodicity
Description
Working hours
6000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
HP oil pump
94931
1
Pressure gauge
94934A
1
HP hose
94935
1
PCV test block with tube
94556
1
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
Damage Hazard. Do not connect the solenoid valve. Damage to the PCV can occur.
PRELIMINARY OPERATIONS
•
The engine must be stopped.
•
The pressure control valve must be removed, refer to section
X72DF
AA00-5562-00AAA-360A-A
Maintenance Manual
Fuel rail - do a check of the pressure control valve
Winterthur Gas & Diesel Ltd.
- 586 -
Issue 002 2020-10
Содержание X62DF
Страница 10: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 002 2020 10...
Страница 165: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 165 Issue 002 2020 10...
Страница 881: ...Approved Tightening Instructions Rev I Page 1 14...
Страница 882: ...Approved Tightening Instructions Rev I Page 2 14...
Страница 883: ...Approved Tightening Instructions Rev I Page 3 14...
Страница 884: ...Approved Tightening Instructions Rev I Page 4 14...
Страница 885: ...Approved Tightening Instructions Rev I Page 5 14...
Страница 886: ...Approved Tightening Instructions Rev I Page 6 14...
Страница 887: ...Approved Tightening Instructions Rev I Page 7 14...
Страница 888: ...Approved Tightening Instructions Rev I Page 8 14...
Страница 889: ...Approved Tightening Instructions Rev I Page 9 14...
Страница 890: ...Approved Tightening Instructions Rev I Page 10 14...
Страница 891: ...Approved Tightening Instructions Rev I Page 11 14...
Страница 892: ...Approved Tightening Instructions Rev I Page 12 14...
Страница 893: ...Approved Tightening Instructions Rev I Page 13 14...
Страница 894: ...Approved Tightening Instructions Rev I Page 14 14...