11.2.2
Auxiliary blower - install
Periodicity
Description
Working hours
30 000
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
AR
Support equipment
Description
Part No.
CSN
QTY
Spur-geared chain block
94017-2.5-6-5
2
Spur-geared chain block
94017-2.5-5-4
3
Shackle (WLL 8500 kg)
94019L
2
Shackle (WLL 6500 kg)
94019K
1
Shackle (WLL 3250 kg)
94019H
3
Slings (WLL 2000 kg)
94039-013
2
Trolley
94015F
1
Lifting tool
94651
1
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
Electric motor
1
Electric motor
1
SAFETY PRECAUTIONS
WARNING
Injury Hazard. Use only applicable equipment to lift and move the electric motor.
PRELIMINARY OPERATIONS
•
The engine must be stopped and made safe for maintenance, refer to section
maintenance work - general procedure
X72DF
AA00-6545-00AAA-720A-A
Maintenance Manual
Auxiliary blower - install
Winterthur Gas & Diesel Ltd.
- 640 -
Issue 002 2020-10
Содержание X62DF
Страница 10: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 10 Issue 002 2020 10...
Страница 165: ...X72DF Maintenance Manual Page left intentionally blank Winterthur Gas Diesel Ltd 165 Issue 002 2020 10...
Страница 881: ...Approved Tightening Instructions Rev I Page 1 14...
Страница 882: ...Approved Tightening Instructions Rev I Page 2 14...
Страница 883: ...Approved Tightening Instructions Rev I Page 3 14...
Страница 884: ...Approved Tightening Instructions Rev I Page 4 14...
Страница 885: ...Approved Tightening Instructions Rev I Page 5 14...
Страница 886: ...Approved Tightening Instructions Rev I Page 6 14...
Страница 887: ...Approved Tightening Instructions Rev I Page 7 14...
Страница 888: ...Approved Tightening Instructions Rev I Page 8 14...
Страница 889: ...Approved Tightening Instructions Rev I Page 9 14...
Страница 890: ...Approved Tightening Instructions Rev I Page 10 14...
Страница 891: ...Approved Tightening Instructions Rev I Page 11 14...
Страница 892: ...Approved Tightening Instructions Rev I Page 12 14...
Страница 893: ...Approved Tightening Instructions Rev I Page 13 14...
Страница 894: ...Approved Tightening Instructions Rev I Page 14 14...